Feasibility
Site analysis, agronomic baseline, regulatory pre-screening, financial pre-modeling.
Deliverables
- Site suitability report
- Crop-shading compatibility matrix
- Permit-readiness dossier
- Pre-financial NPV scenarios
Will the panels produce enough power?
Will the crops still grow?
Will the math hold for twenty-five years?
Three questions. One answer.
book a demo











Permits hinge on data developers cannot produce.
Italy, France, and Germany now require quantitative proof that crops survive under the panels.
Most developers submit qualitative reports and permits stall.
Designs optimized for the panel forget the plant below.
Conventional agrivoltaic layouts maximize irradiance on the panel and accept whatever falls on the crop. After the second growing season, yields fall 15 to 35%. Compliance penalties follow. IRR erodes.
35 years of operation with no operational data layer.
Once an asset goes live, the industry answer to yield problems is wait and see.
We give the asset the continuous decision layer it has never had.
Biological Engine
Crop phenology modeling for the principal European arable and tree crops, calibrated to local agronomic conditions, micro-climate variability, and shading interaction with photovoltaic geometry.
Physical Engine
Three-dimensional radiation and thermal modeling for arbitrary panel configurations: vertical bifacial, single-axis tracking, fixed-tilt elevated, dynamic-tracking.
Financial Engine
Bankable financial modeling integrating energy production, agricultural revenue, regulatory incentives, and operational costs across the asset's 35-year horizon.
Dual Energy engine consumes telemetry data continously — soil moisture, irradiance, phenological observations, panel state.
Third-party sensors stream telemetry into our middleware layer at minute resolution.
The biological engine identifies the current phenological stage and stress signals.
Physical engine resolves panel orientation and tracking for the next 24–72 hours.
The decision engine dispatches actionable interventions to the IPP operator dashboard.
We are not a feasibility tool that exits after permitting. The platform stays deployed through every stage of the asset's life — adapting recommendations as crops rotate, regulations evolve, and operating conditions shift.
Permits, financing, ESG — every gate in an agrivoltaic project depends on trusted, auditable documents. We produce them continuously, in the formats European regulators, lenders, and investors already accept.





